欧美高清熟妇啪啪内射不卡自拍,日韩少妇内射免费播放18禁裸乳,免费观看18禁无遮挡真人网站,精品久久亚洲中文无码

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
欧美日韩国产专区一区二区| 白晶晶果冻传媒国产今日推荐| 亚洲专区+欧美专区+自拍| 又大又紧又粗c死你视频| 国产在线亚洲精品观看不卡| 国产福利永久在线视频无毒不卡| 久久久久亚洲av无码麻豆| 一道本免费高清中字幕1V1| 无码人妻一区二区三区兔费| 蜜桃久久精品成人无码AV| 国产成人高清免费视频网站| 国产一女三男3p免费视频| 亚洲精品一区二区三区四区五区 | 国产av电影在线观看| 把腿张开老子臊烂你多p视频软件| 色综合伊人色综合网站| 新版中文在线官网| 野花日本大全免费观看6高清版| 男女做爰全过程免费的看| 丰满少妇弄高潮了www| 亚洲熟妇无码av不卡在线播放| 午夜免费观看福利片| 久久99亚洲含羞草影院| 欧美无人区码卡二三卡四卡| 在线精品自偷自拍无码中文 | 亚洲av中文无码乱人伦在线r| 日本三级片网站| 性色国产成人久久久精品一区二区| 无码欧美毛片一区二区三| 啦啦啦啦www在线观看视频| 区二区欧美性插b在线视频网站| 在线天堂资源www中文| 亚洲精品国产一区二区第一页| 50岁熟妇大白屁股真爽| 国产成人av综合色| 国产乱子伦| 奇米精品视频一区二区三区| 亚洲国产精品高清在线第1页| 男女18禁啪啪无遮挡激烈| 精品无人区麻豆乱码1区2区新区| 欧洲无线乱码2021免费|